Installed Capacity
48.2 GWh
Global BESS fleet · 24 sites
+8.6 GWh vs 2022
Peak Discharge Power
18.4 GW
4-hr equivalent duration
+24.3% YoY
Yearly Energy Throughput
89.4 TWh
Charge + discharge cycles
+18.2% vs 2022
Total Arbitrage Revenue
$24.8M
Annualized · all projects
+31.2% YoY
Round-Trip Efficiency
87.3%
Fleet average · LiFePO4
+0.8pp vs baseline
State of Health (avg)
95.8%
Fleet avg · Best: 98.2%
Monitoring 2 sites
LCOS (Lifecycle)
$0.089/kWh
Levelized storage cost
−12.4% vs 2022
Demand Charge Savings
$8.4M
Peak shaving · commercial
+14.2% YoY
Charge/Discharge Cycle Profile Site: Mojave-04 (Li-ion 120 MWh) · 72 Hours
Fleet SoC Status Real-time · 8 Global Sites
Price Arbitrage Opportunities Monthly Avg Spread ($/MWh)
State of Health by Site % of Nominal Capacity
Revenue by Service Type 2023 Annual · $M
Capacity Degradation vs Cycle Count 4 Chemistry Types
Top Arbitrage Events — 2023 Buy Low / Sell High
| Date | Market | Buy ($) | Sell ($) | Spread | Volume | Profit |
// SYNTHETIC DATA NOTICE: All battery storage metrics, SoC values, arbitrage revenues, cycle counts, degradation curves, SoH data, market prices, and site-level performance data are randomly generated synthetic data for portfolio demonstration. No real BESS project or energy market is represented.
// METHODS: Charge/discharge cycles modeled with price-dispatch logic · Degradation curves from battery aging models · Arbitrage spreads from price spike distribution · Chart.js v4.4.1